Washington University / BJC Health Care Campus Renewal Project – South Campus Phases 3 and 4 New Patient Tower

St. Louis, Missouri

As part of a 25-year campus renewal plan, T. I. E. was awarded the low voltage systems design for 600,000 SF, $650 million patient tower, entrance, pavilion, and cafeteria.  Low Voltage Systems include electronic security and access controls and A/V systems. The project is in Design currently with plans for completion in 2023.

© 2019 by T.I.E.

Proudly created by Abby Grace Designs